Create a bill of quantities from a tender specification: AI reads functional road and bridge tenders and writes each piece of work as a standard position, such as MMHW items or state DOT pay items, with its source.
Some public road and bridge tenders arrive without a bill of quantities, just a specification of what the client wants built. Before you can price the job, someone has to turn it into a bill of quantities. Streckenheld reads the specification and drafts a bill of quantities of standard positions in minutes, ready for you to check, price and pass on.
Why a bill of quantities from a specification takes so long
In a functional or design-and-build tender, breaking the work down into positions is the bidder's job. The specification often names only a result, such as "build the replacement structure", and spreads the requirements over dozens of pages. The estimator has to:
- Read everything, section by section, and write out every piece of work, from site setup to road markings.
- Break the work down: a replacement structure becomes excavation, foundations, formwork, reinforcement, concrete, waterproofing, bearings, joints and railings.
- Find the right standard item among thousands in the catalogue, and choose its options.
- Carry the values over: concrete classes, layer thicknesses, depths and dimensions, scattered across the whole specification.
That takes days, and every piece of work that's missed is missing from the price.
How Streckenheld turns a specification into a bill of quantities
Every piece of work, listed
The AI reads the whole specification and lists every piece of work you'll have to price: site setup and traffic management, design and verification work, demolition and disposal, earthworks, foundations, the structure itself, waterproofing, drainage, each layer of the road build-up, kerbs and paving, equipment and landscaping. Requirements such as a material class or a test go with the work they belong to. What the specification says isn't part of the tender, or is done by the client, is left out.
The right standard position
For each piece of work, the AI searches the standard catalogue for road and bridge works for matching items, such as the series of the Method of Measurement for Highway Works in the UK or the pay items of your state DOT's standard specifications in the US: from site setup and earthworks to concrete structures and pavements. Anything that finds no match is checked a second time against the whole catalogue.
Options and values filled in
The AI chooses the item's options and fills in the values from the specification, such as concrete classes, layer thicknesses or depths. The position text is always the catalogue's own wording, never written by the AI. Quantities are taken over only where the specification states them.
Free text where the catalogue has nothing
Work the catalogue has no item for, such as a pre-construction condition survey, is added as a free-text line in the right section and clearly marked for you to complete.
Traceable to the source
Every position shows its catalogue code and the passage of the specification it covers. While the draft is being created you see each step live, including what the AI is considering; afterwards, a card on the bill of quantities sums up how it was made.
What's in the bill of quantities
| In the BoQ | What it means |
|---|---|
| Standard position | Position text in the catalogue's wording, with the chosen options and the values from the specification |
| Free-text line | Work without a matching catalogue item, marked for you to complete |
| Quantity | Only where the specification states it; otherwise left empty to complete |
| Source | The passage of the specification the position comes from |
How it works with Streckenheld
- Click "Create BOQ from specification" in your list of bills of quantities and choose the construction site.
- Upload the specification as a PDF.
- Watch or carry on working: the draft is built in the background in five steps: reading, listing the work, picking standard items, filling in the positions, writing the bill of quantities.
- Check the draft: complete the free-text lines and add the missing quantities.
- Carry on as with any bill of quantities: price it with the budget estimate, send quote requests to suppliers and subcontractors, or download it for your estimating software.
Who it's for
- Estimators in road and bridge construction who price functional tenders and don't want to spend days copying standard texts.
- Bid managers in civil engineering who want to take on more tenders than their time used to allow.
- Managing directors who want to bid on tenders without a bill of quantities too, without leaving work out of the price.
The draft takes the reading and writing off your team; the quantities and prices in your bid remain your responsibility.
Frequently asked questions
What does Streckenheld need?
The specification as a PDF with a text layer, as it comes from Word or a tender portal. The AI can't read pure scans without text; Streckenheld tells you straight away instead of producing an incomplete bill of quantities.
Where do the position texts come from?
From the standard catalogue for road and bridge works, such as the Method of Measurement for Highway Works (MMHW) in the UK or the state DOT standard specifications and pay items in the US. The AI picks the matching item and its options and fills in the values from the specification; the text itself is always the catalogue's own wording. Work with no matching item becomes a clearly marked free-text line.
Does the AI work out the quantities?
Only where the specification states the quantity of a piece of work. It never estimates. Positions without a quantity stay in the bill of quantities and in the download, so you can take the quantities off the drawings and complete them in your estimating software.
How do I check the draft?
Every position shows its catalogue code and the passage of the specification it comes from. A card on the bill of quantities sums up how it was created: the number of positions, the free-text lines, the time taken and every AI step with its reasoning.
How long does it take?
A few minutes. It keeps running in the background when you leave the page; the new bill of quantities waits in your list.
Read next
Tender check for bidders: AI checks every bill of quantities position against the measurement and specification rules and the contract terms against NEC, JCT or AIA conditions, with claims, risks and questions.
GAEB explained: GAEB 90, GAEB 2000 and GAEB DA XML, the exchange phases X81 to X86, and how bills of quantities flow between planner, contractor and supplier.
Upload a bill of quantities and let AI extract every position, summarize each section, and flag gaps, risks, and change-order traps before you send it out. Turn a BOQ into a ready-to-send request for quotation in one step.
Turn a bill of quantities into a priced budget in minutes. AI prices every position from your own contracts and past offers, falls back to regional market prices, and shows its assumptions — then export it as CSV, XLSX, or GAEB.
Material spend under control, from the first site
In 30 minutes we show you, on your own documents, what Streckenheld automates.